14-03-24 Mengyuan Zhao

From cslt Wiki
Revision as of 14:26, 23 March 2014 by Zhaomy (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Weekly report:

  • AMR training:
  1. wsj corpus: tested xEnt and mpe.
  2. 1700H : data preparation done. mpe training is very slow. fixing this problem now.
  • mfcc, gfcc, fbank, gfbank comparation: doing a series of experiment.
  • Trained a small nnet 100*600*600*600*600*1500 on wsj-8k-wav.

Target for next week: