Difference between revisions of "14-11-03 Zhiyong Zhang"
From cslt Wiki
(以“Weekly Report: 1, Finished dropout experiments on AURORA4; 2, Finished part experiments on Rectified(AURORA4). Target of next week: 1, Continue the experiment...”为内容创建页面) |
|||
Line 1: | Line 1: | ||
Weekly Report: | Weekly Report: | ||
− | + | 1, Finished Maxout code transplantation from nnet2 to nnet, and optimised the the maxout/diff-maxout coding ; | |
− | + | 2, Reproduced lr0.0006/lr0.0008 remainder experiments of Recified. | |
Target of next week: | Target of next week: | ||
− | + | 1, To transplant P-norm code from nnet2 to nnet; | |
− | + | ||
− | + |
Revision as of 02:25, 4 November 2014
Weekly Report:
1, Finished Maxout code transplantation from nnet2 to nnet, and optimised the the maxout/diff-maxout coding ; 2, Reproduced lr0.0006/lr0.0008 remainder experiments of Recified.
Target of next week:
1, To transplant P-norm code from nnet2 to nnet;